Topping out at LLB BIM in Vaduz

13.10.2023 | Vaduz

LLB 1
LLB 21

HRS & Building Information Modeling (BIM)
The challenges of building with BIM are in the preparation and planning, BIM supports and helps us to bring all threads together in the planning phase. Communication as well as cooperation between all specialist planners is the key to success. Intelligent building means longer life, less mass, and savings in resources and costs. Industrial manufacturing will clearly increase in importance in the future, with strengths such as millimeter-precise prefabrication in the factory and rapid assembly on the construction site. The faster execution of buildings on site is central and construction time and noise emissions can be significantly reduced as a result.
HRS thanks the client for its trust and is pleased to be able to realize the work as a total contractor.

From left:
Arnold Frick, Frickbau
Patrick Fürer, CDO LLB Group
Gabriel Brenna, CEO LLB Group
Petra Miescher, Mayor of Vaduz
Georg Wohlwend, LLB Chairman of the Board of Directors
Jean-Claude Zurflüh, HRS
Marc Fisler, Architect BE
Christian Tabernigg, Architect BE
Fabian Hilbe, LLB
Stefan Marxer, LLB
Klaus Nagl, HRS
Markus Walser, HRS