Campus Pictet de Rochemont
Carouge (GE)
The project consists of a 24-story tower and two buildings, each with 8 floors. The building residential consists of 96 rental apartments and commercial premises. Five basement floors are shared between the two complexes.
Information
Developer
Banque Pictet & Cie SA, Geneva
Caisse de retraite du groupe Pictet, Geneva
Services rendered by HRS
Sole contractor with full cost, quality and deadline guarantee
Architect
dl-a designlab-architecture SA, Geneva
Size
Building volume 377’174 m³
Plot area 99’924 m²
Construction period
December 2021 - May 2026
News
-
A new stage in the construction of the Pictet Campus Carouge
26.06.2023 -
Laying of the foundation stone at the Pictet de Carouge campus
22.09.2023 -
Rehaussement de la grue
28.08.2024 -
Successful event dedicated to sustainable construction on the Pictet Campus
06.12.2024 -
A milestone for the Pictet Rochemont Campus!
07.02.2025 -
Crane removal operation
14.03.2025